Mazeras Memorial Secondary School

Completed in 2024 at a cost of Ksh 1.8M

We had visited this school in 2023 and we realised that a big impact could be made by ensuring that the girls had a reliable source of water.

The school was having to buy in water and so, needed to be quite frugal with the supply.

We built a borehole and diverted this water to an existing water tank.